This Building Supply Warehouse was suffering from settlement occurring to the concrete on the outside of the building right at the threshold of the bay door.
Beacon Building Supply contracted out East Coast Poly Solutions to lift an approach apron in front of their main warehouse door. The forklift operators were faced with a jarring transition from the warehouse to the parking lot, a few loads were lost due to the instability in the joint. East Coast Poly Solutions was able to make the repairs in half-a-day's time and the material cured in a matter of minutes. The transition after we completed the injection was smooth and virtually unnoticeable.
The company did not suffer from any downtime onsite and we were in and out by lunch time. Just one example of how polyurethane injection solutions can help businesses at a very low cost.